- Today is a work day. Students may earn 5 participation points for being involved and engaged in tasks involving "the build".
- Our list for the week is
- Screw down floor
- Strip & sand pallet boards
- Drill weep holes in the sub floor
- Design & construct a fence/barrier
- Frame openings for two (2) windows
- Frame opening for the front door
- Frame the bathroom/kitchen wall
- Our rainy day contingency plan is
- Complete rough sketch of the two (2) profiles (side and rear)
- Begin scale drawing for the two (2) profiles (side and rear)
- Design and sketch the rafters
- Calculate rafter spacing and create a material list
- TODAY (9/15) we began making measurements for the sketches listed above.
Tuesday September 16th
- Today is a work day. Students may earn 5 participation points for being involved and engaged in tasks involving "the build".
Wednesday September 17th
- Today is a portfolio work day. Students need to complete the drawings specified in the above list.
Thursday September 18th
- Unit #1 Test and then work on scale drawings.