Monday, September 15, 2014

Week of September 15 - 18

Monday September 15th

  1. Today is a work day. Students may earn 5 participation points for being involved and engaged in tasks involving "the build". 
    1. Our list for the week is
      1. Screw down floor
      2. Strip & sand pallet boards
      3. Drill weep holes in the sub floor
      4. Design & construct a fence/barrier
      5. Frame openings for two (2) windows
      6. Frame opening for the front door
      7. Frame the bathroom/kitchen wall
    2. Our rainy day contingency plan is
      1. Complete rough sketch of the two (2) profiles (side and rear)
      2. Begin scale drawing for the two (2) profiles (side and rear)
      3. Design and sketch the rafters
      4. Calculate rafter spacing and create a material list
    3. TODAY (9/15) we began making measurements for the sketches listed above. 
Tuesday September 16th
  1. Today is a work day. Students may earn 5 participation points for being involved and engaged in tasks involving "the build". 
Wednesday September 17th
 
  1. Today is a portfolio work day. Students need to complete the drawings specified in the above list.
Thursday September 18th
  1. Unit #1 Test and then work on scale drawings.

No comments:

Post a Comment